{"id":35531,"date":"2026-04-07T11:36:19","date_gmt":"2026-04-07T09:36:19","guid":{"rendered":"https:\/\/www.gauteng.net\/whats-on-g\/?p=35531"},"modified":"2026-04-07T11:36:20","modified_gmt":"2026-04-07T09:36:20","slug":"gauteng-load-reduction-schedule-2","status":"publish","type":"post","link":"https:\/\/www.gauteng.net\/whats-on-g\/gauteng-load-reduction-schedule-2\/","title":{"rendered":"Gauteng Load Reduction Schedule for 7 to 13 April 2026: Full Timetable and Affected Areas"},"content":{"rendered":"\n<p>Gauteng residents will continue to experience scheduled power interruptions this week as Eskom rolls out load reduction across multiple areas from 7 to 13 April 2026. The programme affects both morning and evening peak periods, with outages lasting between four and five hours in some communities.<\/p>\n\n\n\n<p>While load shedding remains suspended nationally, the ongoing load reduction schedule targets specific high-pressure networks. This means thousands of households across Gauteng will still face daily disruptions, particularly during early morning routines and evening peak hours.<\/p>\n\n\n\n<p>ALSO READ: <a href=\"https:\/\/www.gauteng.net\/whats-on-g\/fuel-and-energy-costs-surge-in-2026\/\">Fuel and Energy Costs Surge in 2026: Paraffin Users Left Without Relief<\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Load Reduction Continues Despite Suspension of Load Shedding<\/h3>\n\n\n\n<p>Eskom has confirmed that load shedding remains suspended after South Africa reached more than 300 consecutive days without it. However, load reduction continues as a separate intervention.<\/p>\n\n\n\n<p>According to the utility, load reduction is implemented in areas where infrastructure is under sustained pressure due to illegal connections, overloading and ageing systems.<\/p>\n\n\n\n<p>Unlike load shedding, which is applied nationally, load reduction is localised and rotates across specific communities.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Gauteng Load Reduction Timetable for 7\u201313 April 2026<\/h3>\n\n\n\n<p><a href=\"https:\/\/www.eskom.co.za\/distribution\/load-reduction\/\" target=\"_blank\" rel=\"noopener\">Eskom\u2019s schedule <\/a>confirms two daily outage windows:<\/p>\n\n\n\n<p>\u2022 Morning: 05:00 to 09:00<br>\u2022 Evening: 17:00 to 22:00<\/p>\n\n\n\n<p>Below is the full weekly timetable based on the latest schedule:<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Sunday, 05 April 2026<\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Time<\/th><th>Block<\/th><th>Key Areas<\/th><\/tr><\/thead><tbody><tr><td>05:00 \u2013 09:00<\/td><td>Block I<\/td><td>Vosloorus, Katlehong South, Spruit View, Ramakonopi<\/td><\/tr><tr><td>17:00 \u2013 22:00<\/td><td>Block H<\/td><td>Vereeniging, Sebokeng, Evaton, Daveyton, Etwatwa<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Monday, 06 April 2026<\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Time<\/th><th>Block<\/th><th>Key Areas<\/th><\/tr><\/thead><tbody><tr><td>05:00 \u2013 09:00<\/td><td>Block J<\/td><td>Orange Farm, Sharpeville, Tshepiso, Evaton Central<\/td><\/tr><tr><td>17:00 \u2013 22:00<\/td><td>Block G<\/td><td>Tsakane, Zithobeni, Winterveldt, Mabopane<\/td><\/tr><tr><td>17:00 \u2013 22:00<\/td><td>Block F<\/td><td>Orlando East, Diepkloof, Soweto<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Tuesday, 07 April 2026<\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Time<\/th><th>Block<\/th><th>Key Areas<\/th><\/tr><\/thead><tbody><tr><td>05:00 \u2013 09:00<\/td><td>Block A<\/td><td>Ivory Park, Rabie Ridge, Protea Glen<\/td><\/tr><tr><td>17:00 \u2013 22:00<\/td><td>Block B<\/td><td>Meadowlands, Cosmo City, Diepsloot<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Wednesday, 08 April 2026<\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Time<\/th><th>Block<\/th><th>Key Areas<\/th><\/tr><\/thead><tbody><tr><td>05:00 \u2013 09:00<\/td><td>Block C<\/td><td>Mabopane, Dobsonville, Naledi, Tsakane<\/td><\/tr><tr><td>17:00 \u2013 22:00<\/td><td>Block D<\/td><td>Moroka, Kagiso, Khutsong, Chiawelo<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Thursday, 09 April 2026<\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Time<\/th><th>Block<\/th><th>Key Areas<\/th><\/tr><\/thead><tbody><tr><td>05:00 \u2013 09:00<\/td><td>Block F<\/td><td>Diepkloof, Orlando East, Soweto<\/td><\/tr><tr><td>17:00 \u2013 22:00<\/td><td>Block I<\/td><td>Vosloorus, Katlehong, Spruit View<\/td><\/tr><tr><td>17:00 \u2013 22:00<\/td><td>Block J<\/td><td>Orange Farm, Sharpeville, Evaton<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Friday, 10 April 2026<\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Time<\/th><th>Block<\/th><th>Key Areas<\/th><\/tr><\/thead><tbody><tr><td>05:00 \u2013 09:00<\/td><td>Block G<\/td><td>Tsakane, Mabopane, Winterveldt<\/td><\/tr><tr><td>17:00 \u2013 22:00<\/td><td>Block H<\/td><td>Vereeniging, Sebokeng, Daveyton<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Saturday, 11 April 2026<\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Time<\/th><th>Block<\/th><th>Key Areas<\/th><\/tr><\/thead><tbody><tr><td>05:00 \u2013 09:00<\/td><td>Block J<\/td><td>Orange Farm, Sharpeville, Evaton<\/td><\/tr><tr><td>17:00 \u2013 22:00<\/td><td>Block I<\/td><td>Vosloorus, Katlehong, Spruit View<\/td><\/tr><tr><td>17:00 \u2013 22:00<\/td><td>Block E<\/td><td>Mapetla, Protea South, Naledi<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Sunday, 12 April 2026<\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Time<\/th><th>Block<\/th><th>Key Areas<\/th><\/tr><\/thead><tbody><tr><td>05:00 \u2013 09:00<\/td><td>Block D<\/td><td>Moroka, Kagiso, Tsakane<\/td><\/tr><tr><td>17:00 \u2013 22:00<\/td><td>Block C<\/td><td>Mabopane, Dobsonville, Naledi<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Areas Across Gauteng Facing Repeated Interruptions<\/h3>\n\n\n\n<p>Across the week, multiple communities appear repeatedly in the rotation schedule.<\/p>\n\n\n\n<p>These include:<\/p>\n\n\n\n<p>\u2022 Orange Farm and surrounding extensions<br>\u2022 Vosloorus and Katlehong areas<br>\u2022 Soweto communities such as Diepkloof, Orlando East and Naledi<br>\u2022 Tshwane regions including Mabopane, Winterveldt and Soshanguve linked areas<br>\u2022 Sedibeng areas such as Vereeniging, Evaton and Sebokeng<\/p>\n\n\n\n<p>According to Eskom, outages may last up to five hours depending on the area and demand.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Why Load Reduction Is Being Implemented<\/h3>\n\n\n\n<p>Eskom said the programme is necessary to protect infrastructure and prevent network failure.<\/p>\n\n\n\n<p>Key reasons include:<\/p>\n\n\n\n<p>\u2022 Overloaded local electricity networks<br>\u2022 Illegal connections increasing demand<br>\u2022 Ageing infrastructure in high density areas<\/p>\n\n\n\n<p>The utility noted that without load reduction, prolonged outages could occur due to equipment damage.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What This Means for Gauteng Residents<\/h3>\n\n\n\n<p>Load reduction is increasingly shaping how power interruptions are experienced in Gauteng.<\/p>\n\n\n\n<p>For residents, this means:<\/p>\n\n\n\n<p>\u2022 Power cuts may continue even without national load shedding<br>\u2022 Morning routines and evening activities will be disrupted<br>\u2022 High density areas remain most affected<br>\u2022 Electricity reliability varies by location rather than nationally<\/p>\n\n\n\n<p>The timing of outages during peak hours is likely to have the greatest impact on households and working residents.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">FAQ: Gauteng Load Reduction April 2026<\/h3>\n\n\n\n<p><strong>Is load shedding currently active?<\/strong><br>No. Load shedding remains suspended, but load reduction continues in specific areas.<\/p>\n\n\n\n<p><strong>What is the difference between load shedding and load reduction?<\/strong><br>Load shedding is national, while load reduction targets specific overloaded areas.<\/p>\n\n\n\n<p><strong>How long are outages expected to last?<\/strong><br>Between four and five hours depending on the location.<\/p>\n\n\n\n<p><strong>What times are affected daily?<\/strong><br>05:00 to 09:00 and 17:00 to 22:00.<\/p>\n\n\n\n<p><strong>Will the schedule change?<\/strong><br>Eskom may adjust schedules depending on demand and network conditions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What Happens Next<\/h3>\n\n\n\n<p>Eskom is expected to continue load reduction on a rotational basis as infrastructure constraints persist across Gauteng.<\/p>\n\n\n\n<p>Further updates, including changes to affected areas or outage durations, are likely to be issued as the week progresses. Residents are encouraged to monitor official schedules as the province continues to manage localised network pressure.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gauteng residents will continue to experience scheduled power interruptions this week as Eskom rolls out load reduction across multiple areas from 7 to 13 April 2026. The programme affects both morning and evening peak periods, with outages lasting between four and five hours in some communities.<\/p>\n","protected":false},"author":23,"featured_media":35534,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rank_math_focus_keyword":"","rank_math_title":"","rank_math_description":"","footnotes":""},"categories":[47],"tags":[627,2902,11469],"class_list":{"0":"post-35531","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-news","8":"tag-gauteng-news","9":"tag-load-reduction","10":"tag-public-annoucement"},"_links":{"self":[{"href":"https:\/\/www.gauteng.net\/whats-on-g\/wp-json\/wp\/v2\/posts\/35531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gauteng.net\/whats-on-g\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gauteng.net\/whats-on-g\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gauteng.net\/whats-on-g\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gauteng.net\/whats-on-g\/wp-json\/wp\/v2\/comments?post=35531"}],"version-history":[{"count":2,"href":"https:\/\/www.gauteng.net\/whats-on-g\/wp-json\/wp\/v2\/posts\/35531\/revisions"}],"predecessor-version":[{"id":35533,"href":"https:\/\/www.gauteng.net\/whats-on-g\/wp-json\/wp\/v2\/posts\/35531\/revisions\/35533"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gauteng.net\/whats-on-g\/wp-json\/wp\/v2\/media\/35534"}],"wp:attachment":[{"href":"https:\/\/www.gauteng.net\/whats-on-g\/wp-json\/wp\/v2\/media?parent=35531"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gauteng.net\/whats-on-g\/wp-json\/wp\/v2\/categories?post=35531"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gauteng.net\/whats-on-g\/wp-json\/wp\/v2\/tags?post=35531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}